Phase 10 is scheduled to begin Monday, May 6. The roads in Phase 10 are Longhorn Drive (between Big Range Road intersections) and Trigger Drive.
During working hours (7 a.m. to 5 p.m.), Longhorn Drive traffic will be detoured on to Big Range Road. For safety reasons, refrain from driving through the construction area when the street is closed unless directed by traffic control, as it may pose risks to both your vehicle and the street surface. Throughout construction, streets may be unpaved but open to vehicular traffic. Exercise caution, and refrain from using scooters or bicycles on affected roads.
Temporary street closed/no parking signs will be posted in the work area 48 hours before work begins.
If you live on any of the streets in this phase, you will receive an email notification from the Canyon Lake POA one week in advance of this phase beginning. You can view this notice online at www.clpoa.com/y2phase10.
All members are advised to visit our Road Notices page to sign up for notices and ensure their contact information is correct. For more information about this project, visit www.clpoa.com/roads.